GUT matrix in fleet maintenance: how to calculate it
There are various ways to gain insights into your management approach, most of them using tools fed by everyday fleet data.
One is the GUT matrix. A scoring tool that helps prioritize requests and better delegate vehicle maintenance activities. Learn more below:
- What the GUT matrix is;
- What it is used for;
- Its importance in maintenance management;
- How to build the GUT matrix.
What is the GUT matrix?
Besides being a tool for team management and task allocation, it is also an important resource in fleet maintenance management. The acronym stands for the Portuguese words for Severity, Urgency and Tendency, helping find the best strategies for it, taking into account the prioritization of resources, labor and time.
What is the GUT matrix used for?
Its main function is to help prioritize tasks and actions to take in certain situations. For fleet maintenance, the focus is on understanding which vehicle or which of its problems should be addressed first to prevent it from reaching a critical state.
Why is the GUT matrix important in maintenance management?
In maintenance management, the GUT matrix defines which maintenance tasks are most urgent and which may worsen more quickly. With this view, it brings various benefits. Among them:
Helps organize and improve the quality of transport operations
When vehicles undergo the necessary servicing before a breakdown, their useful life is increased and they are kept in proper operating condition.
In addition to remaining available for use, the asset will have more efficient fuel consumption, need fewer tire changes and be safer on the roads.
In this case, the GUT matrix helps organize vehicle inspection needs and maintenance services. This way, all vehicles are always up to date with servicing, and transport quality improves, as there are fewer unforeseen events along the way.
Defines the priority level of open WOs
If several work orders are opened in the same period or even for the same vehicle, the GUT matrix helps organize and prioritize these requests. The highest results correspond to the services that should receive the highest priority for resolution.
To understand whether an engine problem or a tire issue needs to be addressed first, assign the matrix scores and use the results in your planning.
Speeds up decision-making
Just as it makes prioritizing requests easier, it makes decisions about sending vehicles to the workshop more practical.
Prevents the premature loss of vehicles
When you pay attention to the most urgent problem or the one that can cause more damage in a short time, the chances of the vehicle lasting longer are greater.
Reduces fleet idle time
By prioritizing the services to be carried out, vehicle problems are repaired sooner, before they could lead to a breakdown or more serious failure that would compromise the vehicle's ability to go out on a route.
When a vehicle is inactive, stopped for repairs in the workshop, we consider it idle. Vehicles generally reach this stage when basic services are neglected in the fleet's maintenance routine.
How does the GUT matrix work?
Watch the content we prepared:
(video in Portuguese)
The GUT matrix works with three concepts, represented by the Portuguese initials “G”, “U” and “T”:
- Severity of the problem: determined by the question “what consequence does the vehicle problem have for the operation?”.
- Urgency of the solution: answer the question “how soon must this problem be resolved to avoid the worst consequences?” to determine this aspect.
- Tendency of the problem to grow: ask “how likely is the problem to get worse over time?” to determine the priority for resolving it.
Each of these criteria has a score ranging from 1 to 5. For the severity of the problem, for example, 1 is the least serious and 5 the most serious.
The matrix then combines the three criteria in a table like this:
| Score | Severity | Urgency | Tendency |
| 5 | Extremely serious | Requires immediate action | Worsen quickly |
| 4 | Very serious | Very urgent | Worsen in the short term |
| 3 | Serious | As soon as possible | Worsen in the medium term |
| 2 | Not very serious | Not very urgent | Worsen in the long term |
| 1 | Not serious | Can wait | Remain unchanged |
After the parameters for each problem are determined, the scores are multiplied and the results compared to find the fleet's current priority.
For example, if a truck has a problem with severity 5, urgency 3 and tendency 4, its result is: 60.
Now, if another problem has severity 5, urgency 5 and tendency 4, its result is: 100, and it is the problem that should be addressed first.
How do you build the GUT matrix for your fleet?
First and most importantly, you need to use the data obtained in the everyday routine of your operation.
This is the best (and only) way to arrive at a well-founded matrix that will bring the most effective forecasts and decisions to your company.
The GUT matrix should be built in four fundamental steps:
- List the problems.
- Rate the GUT variables.
- Do the calculation and rank the main problems.
- Develop a plan to resolve the problems according to their priorities.
Practical application of the GUT matrix
Problems identified
Before starting to use the matrix, check which problems need to be better understood.
Its versatility allows very specific issues to be ranked, such as a burned-out headlight or an engine that will not start.
But also more general issues, for example: a very high frequency of vehicle breakdowns, many delivery delays or a lack of parts inventory control.
Assigning scores
As you assess the problems, they should receive scores for the three GUT matrix criteria
GUT matrix example:
| Score | Severity | Urgency | Tendency |
| 5 | Extremely serious Problem 1 | Requires immediate action | Worsen quickly |
| 4 | Very serious Problem 2 | Very urgent Problems 1 and 2 | Worsen in the short term Problem 1 |
| 3 | Serious Problem 3 | As soon as possible Problem 3 | Worsen in the medium term Problems 2 and 3 |
| 2 | Not very serious | Not very urgent | Worsen in the long term |
| 1 | Not serious | Can wait | Remain unchanged |
We therefore identify the following scores:
- Problem 1 – High frequency of vehicle breakdowns: severity 5, urgency 4, tendency 4
- Problem 2 – Frequent delivery delays: severity 4, urgency 4, tendency 3
- Problem 3 – Lack of inventory control: severity 3, urgency 3, tendency 3
Results and order for resolving the problems
The results in our example are:
- Problem 1 – High frequency of vehicle breakdowns: 80
- Problem 2 – Frequent delivery delays: 48
- Problem 3 – Lack of inventory control: 27
This is also the priority ranking for resolving the problems.
Action plan
Knowing the fleet's priorities, think about the most appropriate solutions to implement first. Here, you may encounter the GUT matrix's weakness: it does not help provide solutions, only identify the main problems.
If, in this example, you need to consider the high frequency of vehicle breakdowns first, you should plan maintenance actions such as:
- Analyze the fleet's maintenance history to identify the main recurring maintenance needs and how to avoid them;
- Carry out daily inspections of the vehicles' main items and prevent them from reaching advanced stages of vehicle breakdown;
- Implement predictive maintenance resources to anticipate vehicle failures and increase vehicle durability.
Remember to always think about the full picture: what the action is, when it should happen, who is responsible and how they should do it.
To complement the use of your matrix, a maintenance control spreadsheet is also very useful. Learn how to build yours.
Frequently asked questions
How do you calculate the GUT matrix score?
Which questions help assign each score?
How do you build the GUT matrix for a fleet, step by step?
What type of problem can go into the matrix?
What is the GUT matrix used for in maintenance management?
Does the GUT matrix solve fleet problems?
// newsletter
Fleet management content, straight to your inbox
Articles on tires, maintenance and fleet operations. No spam.